time and motion study
 

Maintenance Management Resources
Six sigma and lean manufacturing, it's all about money:
Business Industrial Network is your best resource when you need fast solutions. After you view this six sigma area dedicated to learning the true cost of equipment downtime with time and motion study, please visit our company.

 

 
True Cost of downtime
Spacer Spacer
TDC-Warning Data Overload!     Add to favorites

See our entire site devoted to the True cost of machine downtime. www.DowntimeCentral.com

Too many variables! Too complicated! Too much change!

Equipment LaborThese are all one time entry of constants, updated annually, exported from your existing computer systems.
 
True Downtime CostThese sub-categories are" per downtime" occurrence entries, but most can be exported from your CMMS.
 
OverheadYou can use a percentage of your existing "Overhead" numbers depending on amount of TDC metrics they are made up of.

Reduced production, scrap and band-aid are less common sub-categories, and may require effort to analyze.

The irony is that every line breakdown — or at least the symptoms of a breakdown — is meticulously monitored. Every time a line is stopped, a quality inspector logs the reasons why and the length of downtime. Similarly, every hour reworking a product that wasn't done right the first time, every pound of scrap, and every unit rejected at a quality inspection gets captured in most manufacturing systems. While the data is always at hand, rarely, if ever, is it extracted from the system and presented to managers to use in an innovative and understandable fashion.

Rob Rose is vice president, product marketing, at Cognos Corporation's Burlington, Mass.

What would really be micro-analyzing:  legal liability for non-delivery, late supplier payments, depreciations and inventory stocking charges, etc.

Data collection solutions below:

First view the "Production Counting White Paper" to see how to develop your data collection process on sound principles. We want to thank ATSI for donating this valuable article.

Using MDT’s as machine data collection  “front-ends” for  MRPII, ERP, MES,  CMMS, SQC, SPC,  and bar code data collection systems. (Production Process)

 New Document
Please use the Content Navigation Menu below to share in discussions about "Data Overload Category" or look up other related content.
content
discussion surveys articles white downloads more  
 
 
Spacer 

Corporate Sponsors

Supporting the True Cost of Downtime with their product and services

oee-production-process

maintenance-engineering-books

reliability-award

oee-production-process

 
 
Spacer Spacer

MAIN:   Home | TDC | Standards | OEE | Glossary | Download | Search | Feedback
TDC:    Equipment | Labor | Downtime | Link to us | Site Content Page | Awards
Other:  Survey | Discussion | Contact Us | About DT
           Entire Site Map